Volkswagen Golf Service & Repair Manual: 2-pack HS Optimum clear coat
2-pack HS Optimum clear coat -LZK 769 K02 A5- |
2-pack HS Optimum clear coat is a VOC compliant (VOC content
< 420 g/l), high-grade and productive high-solid clear coat. |
Easy to apply and economical to use |
Very good infrared drying |
|
|
|
2-pack VHS hardener -LHA 009 051 A2-/-LVM 009 051 A5- |
2-pack VHS hardener, fast-drying -LHA 009 050 A2- |
2-pack VHS hardener, slow-drying -LHA 009 052 A2-/-LHA 009
052 A3- |
2-pack VHS hardener, extra slow-drying -LHA 009 053 A2- |
See technical data sheet for 2-pack VHS hardener
→ Chapter |
For elasticization, see
→ Anchor |
|
|
|
Application time/pot life: |
– |
Mixed for spraying, 80 to 100 minutes at +20°C |
|
|
|
Method of application: “spray”. |
|
|
|
– |
The application viscosity at +20 °C is the “compliant” and
“HVLP” mixing viscosity. |
|
|
|
– |
Adjust spray nozzle following manufacturer's instructions to
1.2-1.3 mm for “compliancy”. |
– |
Adjust spray nozzle following manufacturer's instructions to
1.3-1.4 mm for “HVLP”. |
– |
Adjust spray pressure following manufacturer's instructions
to 2.0-2.5 bar for “compliancy”. |
– |
Adjust atomising pressure following manufacturer's
instructions to 0.7 bar for “HVLP”. |
|
|
|
– |
Apply in one-and-a-half coats. |
Note
The first half-coat should form a nearly complete, thin film
over which a full spray coat is directly sprayed. |
– |
The specified thickness for the dry film is 45-55 µm. |
|
|
|
Air drying at +20 °C ambient temperature: |
Dust dry in 40-50 minutes |
Dry for assembly in 4-6 hours |
|
|
|
Final flash-off time with force drying is at least
5-10 minutes. |
|
|
|
Force drying at +60 °C material temperature with: |
2-pack VHS hardener -LHA 009 051 A2-/-LVM 009 051 A5-
20-25 minutes. |
2-pack VHS hardener, fast-drying -LHA 009 050 A2-
15-20 minutes. |
2-pack VHS hardener, slow-drying -LHA 009 052 A2-/-LHA 009
052 A3- 20-30 minutes. |
2-pack VHS hardener, extra slow-drying -LHA 009 053 A2-
25-35 minutes. |
|
|
|
Final flash-off time with infrared drying is at least
5-10 minutes. |
|
|
|
Infrared drying with short-wave radiant heater, 8-12 minutes |
|
|
|
Elasticization of rigid and semi-rigid plastics: |
First mix the base material with 15% elastic additive -ALZ
011 001-. |
Mixture with 2-pack VHS hardeners, 3:1 with 5% thinner
(drying time increases). |
|
|
|
Personal protective equipment: |
Adhere to the safety data sheet. |
Wear personal protective equipment during application. |
|
|
|
Flash point: |
Above +23 °C |
VOC content:
2004/42/IIB(d)(420)420 |
The EU limit value for this
product (product category IIB.b) in ready-to-spray form is max. 420 g/l
of volatile organic compounds. The VOC content of this product in
ready-to-spray form is max. 420 g/l. |
The guaranteed storage time of 2-pack HS Optimum clear coat
-LZK 769 K02 A5- is 48 months from production date. May be used
until the date stated on the label at latest if stored in sealed
original containers at +20 °C. |
|
|
|
Designation:
2-pack HS Vario clear coat -L2K 769 K01 A5-
Issued 06.2013
Product description
...
Designation:
2-pack HS Optimum Plus clear coat -LZK 769 K07 A5-
Issued 04.2013
Product description
...
© 2016-2024 Copyright www.vwgolf.org